Spare Parts Logistics for Industrial Equipment: The Slow-Moving Inventory Problem

A spare part that is used once every three years can still stop a plant for weeks if it is missing. Standard inventory methods, built for products that sell every day, handle these items badly. Here is how spare parts are forecast and stocked differently.

Rahimeh Neamatian Monemi, PhD
Author
Rahimeh Neamatian Monemi, PhD
All articles
Shelves of boxed spare parts and labelled bins in a maintenance stores room at an industrial site

Every plant, rail operator, port and utility holds a store of spare parts: bearings, seals, motors, circuit boards, valves, gearboxes. Many of these items are used rarely, some only once in several years, and some never. Yet when one is needed and not available, the cost can be very high: a stopped production line, a train out of service or a crane that cannot work.

This is the slow-moving inventory problem. It ties up a lot of capital in items that sit on shelves, while still causing shortages of the parts that matter at the moment they are needed. Standard inventory methods, built for products with steady demand, are a poor fit.

§ 01Why Standard Methods Fail

Classic reorder rules assume demand that is reasonably regular, often approximated by a normal distribution. Spare parts demand is intermittent: long periods of zero, then a demand of one or a few units. Averages are misleading, because an average of 0.2 units per month says little about whether the next request will come next week or in two years.

Forecasting methods designed for intermittent demand, such as Croston's method and its variants, separate the time between demands from the size of each demand. They are a better starting point, but for very slow items even these have little history to learn from. A part used twice in ten years cannot be forecast precisely from its own history alone.

§ 02Criticality Comes First

For spare parts, the key question is often not how much demand there will be, but what happens if the part is missing. A cheap gasket for a machine with a redundant twin can wait a few days. A unique component for a single-line bottleneck cannot.

So stocking decisions start with classification by criticality, lead time and cost. Highly critical items with long lead times may justify holding one unit even if it is rarely used, essentially as insurance. Non-critical items with short lead times can often be bought when needed. The point of the analysis is to make this trade-off explicit for each item, instead of applying one rule to everything.

§ 03Using the Installed Base and Maintenance Plans

Spare parts demand is not random. It comes from the equipment in service and how it is maintained. Planned maintenance creates predictable demand: if a gearbox overhaul is scheduled for next spring, its parts can be ordered in advance rather than held all year. Linking the spare parts system to the maintenance plan removes a large part of the uncertainty.

Condition monitoring adds more. If a predictive model flags a bearing as degrading, the replacement part can be reserved or ordered before the failure. In this way, predictive maintenance does not only reduce breakdowns; it turns unplanned spare parts demand into planned demand, which needs less safety stock.

§ 04Pooling Across Sites

An organisation with several plants or depots often holds the same critical part in each location. Pooling, holding fewer units centrally or at one site and moving them quickly when needed, can maintain availability with less inventory. Whether it works depends on how fast a part can be moved compared with how long the equipment can wait.

Some industries go further and share pools between companies, or rely on suppliers to hold stock under agreements. Each option changes the cost of a shortage and the inventory needed to avoid it.

§ 05Where to Start

A first review lists the spare parts with their stock value, demand history, lead time and the equipment they serve, then classifies them by criticality with the maintenance team. Two groups usually stand out: high-value items with no demand for years, which may be candidates for pooling or disposal, and critical items with long lead times and no stock, which are hidden risks.

Predictim PMPlus forecasts asset degradation and produces maintenance schedules across infrastructure and plant. Feeding those forecasts into spare parts planning helps align stock with the work that is actually coming.

Not ready for a project? Ask an engineer your question by email. No call needed.

Ask a question
Engage

Ready to optimize your operations?

Talk to our technical team about your operational challenge. An engineer replies within 72 hours, Monday to Friday.