HEALTHCARE OPERATIONSJanuary 29, 2026 · 3 min read

Operating Room Scheduling: The Optimization Problem Behind Surgical Throughput

Operating theatres are among the most expensive resources in a hospital, and they depend on surgeons, nurses, anaesthetists, equipment and beds downstream. Scheduling them well is a layered optimisation problem where uncertainty in case durations matters as much as the plan itself.

Rahimeh Neamatian Monemi, PhD
Author
Rahimeh Neamatian Monemi, PhD
All articles
Empty modern operating theatre with surgical lights, an operating table and monitoring equipment

Operating theatres sit at the centre of hospital activity. They are costly to staff and equip, and the flow of patients through them affects wards, intensive care, recovery rooms and outpatient waiting lists. When theatre time is lost to late starts, cancellations or overruns, the effect spreads across the hospital.

Scheduling them is not one decision but a chain of decisions at different time scales, each with its own constraints. Treating the chain as a whole, and planning for the uncertainty in how long operations take, is where optimisation can help.

§ 01Three Levels of Decision

At the strategic level, the hospital decides how much theatre capacity each specialty gets over the year, often as a master schedule of blocks: theatre three on Tuesday mornings goes to orthopaedics, for example. This sets the frame for everything else and is usually revised a few times a year.

At the tactical level, specific patients from waiting lists are assigned to dates and blocks, taking into account clinical priority, how long each patient has waited, surgeon availability and the expected length of each operation.

At the operational level, the cases of a given day are sequenced within each theatre, staff and equipment are confirmed, and the plan is adjusted as the day unfolds.

§ 02Uncertainty in Case Durations

Operation durations vary, sometimes a lot, even for the same procedure performed by the same surgeon. If a list is planned using average durations, about half the days will overrun, leading to overtime or late cancellations. If it is planned with large margins, theatres sit idle at the end of the session.

Better schedules use the distribution of durations rather than a single number. Historical data, broken down by procedure, surgeon and patient factors, can estimate that distribution. The scheduling model then chooses how many cases to put on a list so that the risk of overrun stays at an agreed level, which turns a vague trade-off into an explicit decision.

§ 03Sequencing Within the Day

The order of cases within a session matters. Putting shorter, more predictable cases first can reduce waiting for later patients and make overruns rarer. Clinical considerations come first, though: children, patients with diabetes or with allergies may need early slots, and infected cases may need to go last for cleaning reasons. Shared resources such as specialised equipment or imaging may limit what can happen in parallel in different theatres.

Turnover time between cases, for cleaning and preparing the room, is also a target for improvement. Parallel processing, such as anaesthetising the next patient in an adjoining room, can shorten it, but it needs staff and space.

§ 04Downstream Beds Shape the Schedule

A theatre schedule that ignores beds is incomplete. Major operations need ward beds for several days and some need intensive care. If several such cases are scheduled on the same day, the wards may be full by midweek, and later operations are cancelled for lack of a bed, not lack of theatre time.

Models that link the theatre schedule to expected bed occupancy can smooth the load across the week, for example by spreading cases that need intensive care. This often reduces cancellations more than any change inside the theatre itself.

§ 05Where to Start

Most hospitals record start and end times for every operation. Analysing a year of this data shows how accurate planned durations are, how often lists overrun or finish early, how much time is lost between cases, and how often cancellations are caused by beds. These figures point to which level of the chain offers the most room for improvement.

Optimisation does not replace the clinical judgment of those who build the lists. It gives them a way to see the consequences of a draft plan, in overtime risk, idle time and bed load, before the day begins.

Not ready for a project? Ask an engineer your question by email. No call needed.

Ask a question
Engage

Ready to optimize your operations?

Talk to our technical team about your operational challenge. An engineer replies within 72 hours, Monday to Friday.